Java在线运行

版本:

所属目录
点击了解高性能代码运行API
运行结果
教程手册
代码仓库
极速运行
终端运行
图形+终端

                        
以下是用户最新保存的代码
[更多]
显示目录

Java 8 – HijrahDate, How to calculate the Ramadan date



搭载国产梦丘操作系统,支持安装软件,在线编程可视化开发软件,无需配置开发环境

点击购买 梦丘固件

Ramadan is the 9th month of the Islamic calendar, the entire month.

1. HijrahDate -> Ramadan 2016

Full example to calculate the start and end of the Ramadan 2016

TestHijrahDate.java

package com.mkyong.date;

import java.time.LocalDate;
import java.time.chrono.HijrahDate;
import java.time.temporal.ChronoField;
import java.time.temporal.TemporalAdjusters;

public class TestDate {

    public static void main(String[] args) {

        //first day of Ramadan, 9th month
        HijrahDate ramadan = HijrahDate.now()
                .with(ChronoField.DAY_OF_MONTH, 1).with(ChronoField.MONTH_OF_YEAR, 9);
        System.out.println("HijrahDate : " + ramadan);

        //HijrahDate -> LocalDate
        System.out.println("\n--- Ramandan 2016 ---");
        System.out.println("Start : " + LocalDate.from(ramadan));

        //until the end of the month
        System.out.println("End : " + LocalDate.from(ramadan.with(TemporalAdjusters.lastDayOfMonth())));

    }

}

Output

HijrahDate : Hijrah-umalqura AH 1437-09-01

--- Ramandan 2016 ---
Start : 2016-06-06
End : 2016-07-05

References

  1. Wikipedia – Ramadan (calendar month)
  2. HijrahDate JavaDoc
由JSRUN为你提供的Java在线运行、在线编译工具
        JSRUN提供的Java 在线运行,Java 在线运行工具,基于linux操作系统环境提供线上编译和线上运行,具有运行快速,运行结果与常用开发、生产环境保持一致的特点。